Skip to content
Size a system

What size, and what it costs.

A chiller that is forty per cent undersized does not hold the reservoir forty per cent less well. It holds it at 27 °C all summer, which is not a degraded outcome — it is root disease. So the sizing is arithmetic from stated assumptions rather than a rule of thumb, and every assumption is on the page where you can disagree with it.

Reservoir
200 L
Circulation
600 L/h
Peak delivery
26 L/h
Daily water
48 L
Chiller
161 W ≈ 0.22 HP
Aeration
1.7 L/min

Of that cooling load, 99 W leaks in through the tank wall and 30 W is the circulation pump putting its own power straight into the water — which is not a rounding error and is the figure most often left out. It pulls the tank down one degree in about 86.7 minutes, which is what decides whether it can recover from an afternoon.

The bill of materials

Bench Farm Commercial

Multiple rooms and zones, mixed crops. Industrial mini-PC or a VM, with an optional warm standby. 15 or more, plus third-party PLCs. Modbus TCP and RTU, BACnet/IP to the HVAC, 4–20 mA transmitters, LoRaWAN outdoors.

Traceability reports somebody can hand to an auditor, and an audit log that says who changed a setpoint.

Item Qty Each Line
Industrial fanless mini-PC, DIN mounted 1 ₹42,000 ₹42,000
Warm standby unit
Optional, and cheaper than one lost week of a polyhouse
1 ₹42,000 ₹42,000
ESP32-S3 node, built as the Bench list
Per node
16 ₹11,350 ₹181,600
RS-485 transmitters, EC/pH/temperature
Two per dosing reservoir, and that is a rule not a preference
8 ₹7,800 ₹62,400
Substrate sensors
Imported
8 ₹12,500 ₹100,000
4–20 mA pressure transmitters 4 ₹4,200 ₹16,800
Industrial dosing pump controller 2 ₹28,000 ₹56,000
Reservoir chiller, 1 HP 2 ₹78,000 ₹156,000
Modbus TCP gateway 2 ₹9,000 ₹18,000
Panel build, RCDs, contactors, labelling
Engineered and certified, not assembled
1 ₹65,000 ₹65,000
Total, ex-GST₹739,800

Mid-2026 street prices for the Indian market. They will be wrong within a year and they are here anyway, because a bill of materials with no numbers in it is one nobody can make a decision from. Anything imported carries customs and freight that are frequently more than the part.

Electrical safety is not a line item. The RCD is in the list because it is mandatory, and the panel work at the Farm and Commercial tiers is engineered rather than assembled. Have the mains section reviewed by a licensed electrical engineer before anything is sold or installed.

Crop intelligence

Going in during August

Sowing windows open right now, from the crop reference.

Crop Sow Days pH Temp °C Yield
Guava Jul–Aug (planting) 2–3 yr to bear 6.0–7.5 23–30 20–25 t
Pomegranate Jul–Aug (planting) 2–3 yr to bear 6.5–7.5 20–35 15–20 t
Ber (Indian Jujube) Jul–Aug (planting) 2–3 yr to bear 6.0–8.5 20–35 15–20 t
Calamondin Jul–Aug 2–3 yr 5.5–6.5 18–32 12–20 t
Tea Jun–Aug (planting) 3–4 yr to pluck 4.5–5.5 18–30 2–3 t made tea
Oil Palm Jun–Sep (planting) 3–4 yr to bear 5.0–7.0 24–32 20–25 t FFB
Lemon Jul–Aug (planting) 3–4 yr to bear 6.0–7.5 20–32 15–20 t
Jojoba Jul–Aug 3–4 yr 6.0–8.0 20–35 1.5–3 t
Feijoa Jul–Aug 3–4 yr 5.5–7.0 10–25 10–15 t
Loquat Jul–Aug 3–4 yr 6.0–7.5 15–30 10–15 t
Jujube Jul–Aug 3–4 yr 6.0–8.0 15–35 10–15 t
Grapefruit Jul–Aug 3–4 yr 5.5–7.5 15–35 20–30 t
Citron Jul–Aug 3–4 yr 5.5–7.5 18–32 15–25 t
Kumquat Jul–Aug 3–4 yr 5.5–6.5 12–30 8–14 t

54 more in this list. All 538 crops, with every column → The sowing year →