Skip to content
Compare

Betel Vine vs Coffee

Both are Plantation. Each axis is a percentile across all 538 crops — 80 means higher than four-fifths of the table. Where an axis is missing, the crop genuinely is not measured that way.

Betel Vine Coffee

Measure Betel Vine Coffee
Season Perennial Perennial
Sowing window Jun–Jul Jun–Jul (planting)
Days to harvest 6–8 mo 3–4 yr to bear
Spacing 60 × 30 cm 2.5 × 2.5 m
Soil pH 6.5–7.5 6.0–6.5
Water 1500–2000 1500–2000
Temperature °C 20–32 15–28
Seed rate Cuttings 1,600 plants
Yield 50–60 lakh leaves 1–1.5 t clean
Watch for Foot rot, leaf spot White stem borer, leaf rust

Other plantation comparisons

Crop intelligence

Other plantation, side by side

Everything in the same group, on the figures that decide what to plant.

Crop Sow Days pH Temp °C Yield
Pyrethrum Sep–Oct 2–3 yr 5.5–7.0 10–22 0.8–1.5 t
Tea Jun–Aug (planting) 3–4 yr to pluck 4.5–5.5 18–30 2–3 t made tea
Coffee Jun–Jul (planting) 3–4 yr to bear 6.0–6.5 15–28 1–1.5 t clean
Cashew Jun–Jul (planting) 3–4 yr to bear 5.5–7.0 20–35 1–1.5 t nuts
Cocoa Jun–Jul (planting) 3–4 yr to bear 5.5–7.0 20–30 1–1.5 t dry bean
Oil Palm Jun–Sep (planting) 3–4 yr to bear 5.0–7.0 24–32 20–25 t FFB
Bamboo Jun–Jul 4–6 yr 5.0–7.0 18–35 8–15 t
Coconut Jun–Jul (planting) 5–6 yr to bear 5.5–7.5 20–32 80–120 nuts/palm
Arecanut Jun–Jul (planting) 5–7 yr to bear 5.5–7.0 20–32 2–3 t dry kernel
Palmarosa Jun–Jul 5–6 mo 6.0–8.0 20–35 15–25 t
Rubber Jun–Jul (planting) 6–7 yr to tap 4.5–6.0 25–34 1.5–2 t dry rubber
Citronella Jun–Jul 6–8 mo 5.5–7.5 20–32 20–30 t
Betel Vine Jun–Jul 6–8 mo 6.5–7.5 20–32 50–60 lakh leaves
Rattan Jun–Jul 7–10 yr 4.5–6.5 22–32 2–4 t

5 more in this list. All 538 crops, with every column → The sowing year →